![]() |
| Choose a location and assemble all the required equipment and instruments. Set up the high precision GPS (Global Positioning System) to get an exact location so we can find the AWS in future years. |
| A properly set tower with the main pit and anchor pits all filled in. The tower can now support the weight of a person climbing on it. |
| Installing the instruments, starting from the top down. The first item is the anemometer. We also have to determine which direction is true north and correctly align the wind direction detector. |
| Add all the additional instrument and the data logger box. Connect all the wiring from each instrument in the correct location. |
| Connect the power system (in the orange cases) and we have a completed installation. |


No comments:
Post a Comment